Guidance Videos for Using Pipe Rigs to Inform Lead and Copper Corrosion Control Treatment Decisions

Video

VIDEO-5081-1 

(Aqua)

Standardize Sampling Procedure for Stagnant Samples

https://youtu.be/YdUM72_vq54

VIDEO-5081-2 

(City Rochester)

Guidelines for Lead Service Line Harvesting

https://youtu.be/d19_WXqZXhM

VIDEO-5081-3 

(GCWW)

Technique for Acclimating Lead Service Lines After Harvesting and Best Practices for Pipe Rig Startup

https://youtu.be/QCKFLBZr2-k

VIDEO-5081-4 

(GLWA)

Best Practices for Lead Service Line Harvesting & Preservation

https://youtu.be/gsZ3kSdRn9c

VIDEO-5081-5

(Halifax)

Coupling Recirculating Water Main Test Sections With Lead Pipe Racks to Study Lead-Iron Interactions in the Context of Corrosion Control Treatment

https://youtu.be/YhfzFB-Ev4s

VIDEO-5081-6

(MWRA)

MWRA Pipe Rig Operation

https://youtu.be/0gJPdgr3wO0

VIDEO-5081-7

(NYCDEP)

How to Filter a Lead Sample

https://youtu.be/mhMk1DUSei0

VIDEO-5081-8

(PWB)

Stagnant and Flowing Water Sample Collection, Including from Premise Plumbing Fixtures

https://youtu.be/L45gG8FOnG8

VIDEO-5081-9

(Toronto)

Overview of Pipe Rig and How it Operates

https://youtu.be/qZ_C6x5dWME